|
| Pekalongan University Project ( 23-06-2011 ) |
 | In Pekalongan University Project at Pekalongan - Central Java which is done by PT. Kali Abang Pratama Jaya, PT Boral Pipe and Precast Indonesia was appointed as a supplier for Ground Water Tank with a size of 50 m3 |
|
|
| Boral Joint East Flood Canal ( 08-06-2011 ) |
 | Boral Pipe and Precast Indonesia became the supplier for the construction project east flood canal in East Jakarta.
To cope with flooding due to local rainfall and flow from upstream in the eastern part of Jakarta Flood Canal constructed Eastern (BKT). Besides functioning to reduce the threat of flooding in 13 areas, to protect residential, industrial, and warehousing in eastern Jakarta, BKT is also intended as a water conservation infrastructure to recharge ground water and raw water sources and water transportation infrastructure. BKT is planned to accommodate the flow of Ciliwung Kali, Kali Cililitan, Cipinang Kali, Kali Sunter, Buaran Kali, Kali Jati Kramat, and Kali Cakung. Catchment area (catchment area) covering approximately 207 square kilometers or approximately 20,700 hectares.
Boral Pipe and Precast as a manufacturer of concrete pipe and pre-print-quality, actively participate in project construction. This can be seen from the supply that is continuously carried out by the company from a few years ago. For the year 2009, PT. Boral Pipe and Precast Indonesia to supply the needs of development as much as 944.9 tons. Active role the company resumed in 2011 by providing supply as much as 351 tons. Supply provided to the contractor that is Manggala Pratama Jaya Construction. |
|
|
| Aqua Danone New Project Factory |
 | At Aqua Danone New Factory construction project in Cianjur, West Java, which is done by PT. Murinda Iron Steel,PT. Boral Pipe and Precast Indonesia was appointed as the supplier for precast concrete product line that is U-Ditch with a size of 100 x 100 x 120 mm2 |
|
|
| Wedabay - Halmahera Laboratorium Project |
 | In Wedabay - Halmahera Laboratorium Project which is done by PT. Restu Prima Karya, PT. Boral Pipe and Precast Indonesia was appointed as the supplier for the product line of precast concrete Beam with a size of 300 x 400 mm2 and the U-ditch 400 x 600 mm2 |
|
|
| Jababeka Project " ROW 17 - Medical City " |
 | In Jababeka Project at the Medical City which is done by PT. Putra Bintang Sembada, PT. Boral Pipe and Precast Indonesia was appointed as the supplier for the product line of precast concrete U-Ditch with size 1400 x 1600 mm2 |
|
|
| Rehabilitation Water Gate project at Kebun Pedes, Bogor |
 | In Rehabilitation Water Gate project in Kebun Pedes Bogor done by PT. Hero Partners Selaras, PT. Boral Pipe and Precast Indonesia was appointed as the supplier for the product line of precast concrete Box Culvert with Top & Bottom measures 3.5 x 4 m2 |
|
|
| Bekasi Fajar Project at Industri Area MM 2000 |
 | On the Project Bekasi Fajar at Industrial Area MM 2000, which was done by PT. Glitter Indo Pratama and PT. Putra Bintang Sembada, PT. Boral Pipe and Precast Indonesia was appointed as a supplier for precast concrete product line that is U-Ditch with the size 1.6 x 1.6 m2 |
|
|
| Ching Luh Pasar Kemis Tangerang Project |
 | On Ching Luh Pasar Kemis Tangerang Factory Project, PT. Boral Pipe and Precast Indonesia was appointed as the supplier for precast drainage product which is Pipe Type RJ and FJ with size dia 300mm until 800mm class 1 and 2 with total 388 ton. |
|
|
| PT. Ukanik (Indomaret storage) Tangerang Project |
 | On PT. Ukanik (Indomaret Storage) Tangerang Project, PT. Boral Pipe and Precast Indonesia was appointed as the supplier for drainage precast product that is Pipe FJ Type Class 1 with size 300 X 2440mm and 600 X 2440mm, box culvert monolith 400X400X1200mm and porous chamber 1000X750mm with total 31 ton. |
|
|
| GOR Bekasi Cikarang Barat Project |
 | On GOR Bekasi Cikarang Barat Project, PT. Boral Pipe and Precast Indonesia was appointed as the supplier for drainage precast product that is U-Ditch size 1000X1000X1200mm and Cover U-Light size 1000X600mm Coak with total 346 ton. |
|
|
| PT. SCI Kelapa Nunggal Cileungsi Bogor Project |
 | On PT. SCI Kelapa Nunggal Cileungsi Bogor Project, PT. Boral Pipe and Precast Indonesia was appointed as The supplier for drainage precast product that is U-Ditch 400X600X1200mm and Pipe RJ Type Class 2 with size 800X2440mm with total 46 ton. |
|
|
| Pool Taksi Alam Sutra Tangerang Project |
 | On Pool Taksi Alam Sutra Tangerang Project, PT. Boral Pipe and Precast Indonesia was appointed as the supplier for drainage precast product that is U-Ditch size 400X600X1200mm and 800X800X1200mm and Pipe Type FJ Class 2 with total 52 ton. |
|
|
| Jalan dan Kawasan Komersil CBD 3 Segment 2 Bintaro Tangerang |
 | On Jalan dan kawasan komersil CBD 3 Segment 2 Bintaro Tangerang, PT. BORal Pipe and Precast was appointed as the supplier for precast products that is MH Cover Light Duty, MH Surround Heavy Duty, Cover Inlet , Pipe and Cover Heavy Duty and Light Duty with total 398 ton. |
|
|
| Villa Ubud Residence Ciledug |
 | On Villa Ubud Residence Ciledug Project, PT. Boral Pipe and Precast Indonesia was appointed as the supplier for drainage precast produk that is reinforced pipe with size 300x2440mm FJ Type class 1, 400x2440mm FJ Type class 1 and size 1050x2440mm FJ Type class 2 and cover product U- Light size 500 L=600 and Cover U-light 800 L=600 with total 122 tons. |
|
|
| Taman Impian Jaya Ancol Project |
 | on Taman Impian Jaya Ancol Project, PT. Boral Pipe and Precast Indonesia was appointed as the supplier for precast drainage which is Box Culvert Monolith U-Ditch and Cover with total 423 tons |
|
|
| PT. Bumi Serpong Damai Project |
 | on all projects that being handled by PT. Bumi serpong Damai, PT. Boral Pipe and Precast Indonesia as the supplier for precast products for drainage with different types of products since 2008 until present with total thereabouts 20,000 tons |
|
|
| Saluran Segmen 5 - Bintaro Project |
 | segment 5 drainage - Bintaro projects, PT. Boral Pipe and Precast Indonesia was appointed as the supplier for precast products Box Culvert size 2500 X 2500 X 1200mm and 2500 X 2500 X 1200mm, stek and Pipe RJ Type size 800 x 2440mm Class 3 and Pipe RJ Type 1650 X 2440mm Class 3 with a total of 596 tons. |
|
|
| Jl. Muchtar Raya Sawangan Drainage Project |
 | On Muchtar Raya Road Sawangan Depok project, PT. Boral Pipe and Precast Indonesia was appointed as the supplier for the precast product of Box Culvert Monolith 800 X 800 X 1200mm and U- Ditch with size 400 X 400 X 1200mm and 600 X 600 X 1200mm and U-light Cover 400 size L = 600 coak and U-light 600 L = 600 with a total of 176 tons . |
|
|
| Marunda Center Project |
 | On Marunda Center Project, PT. Boral Pipe and Precast Indonesia was appointed as supplier for precast product drainage such as U-Ditch with size 600x600x1200mm, 800x600x1200mm and 800x800x1200 with total 545 tons. |
|
|
| Banyu Urip Avour Simo - Surabaya Drainage Project |
 | On Banyu urip Surabaya drainage project PT. Boral Pipe and Precast Indonesia as a supplier of precast drainage product that is Box Culvert with size 3500 x 3500 x 1200 mm with a total of 30.551 tonnes. |
|
|
| DSDP (II) Paket Kontrak ICB-2 Kuta Bali Project |
| At DSDP (II) drainage Kuta Bali Project PT. Boral Pipe and Precast Indonesia as a supplier for Sewer Pipe product Dia. 200 until 800, 2440mm with total 4.206 tonnes. |
|
|
| Pembangunan Pedestrian Jalan Gubeng - Surabaya Project |
| At the pedestrian road construction projects Gubeng - Surabaya PT. Pipe and precast Boral Indonesia supplying U-Ditch size 2000 X 1200 X 1200mm + Cover with Total 3.219 tons. |
|
|
| Pembangunan Pedestrian Type 2 Jl. Gubeng - Surabaya Project |
| At pedestrian Development Project Road Type 2 Gubeng Surabaya, PT. Boral Pipe and Precast Indonesia remains as a supplier for the product U-Ditch size 2000 X 1200 X 1200mm + Cover with total of 2.673 tons. |
|
|
| Soekarno Hatta Airport Taxi Way Jakarta Project |
| At Soekarno-Hatta airport Taxi Way projects, PT. Boral Pipe and Precast Indonesia as a supplier for the product Box Culvert with size 2000 X 2000 X 900mm T = 400mm with a total 1.893 tons. |
|
|
| PT.Glostar Indonesia Desa Bojong Kec. Cikembar - Sukabumi Project |
 | In the projects of PT. Glostar Indonesia at Sukabumi West Java , PT. Boral Pipe and Precast Indonesia as a supplier for the product U-Ditch with size 1600 x 1600 x 1200mm t = 250mm + cover with total 1.213 tons. |
|
|